What evacuation level must it reach on an R-11 chiller before the chiller is scrapped?
Recovery requirements · EPA 608 Type III. The correct answer, and the reasoning behind it.
Evacuation levels for low-pressure appliances, and major versus non-major repairs.
The question
A contractor still owns a recovery unit manufactured in 1991. What evacuation level must it reach on an R-11 chiller before the chiller is scrapped?
- 25 inches of Hg vacuum, a looser level for older units
- 4 inches of Hg vacuum, the usual pre-1993 level
- 25 mm Hg absolute, the same as newer equipmentCorrect answer
- 0 psig, since older units cannot pull a vacuum
Why “25 mm Hg absolute, the same as newer equipment” is correct
For most appliance types Table 1 gives a looser level for recovery equipment made before November 15, 1993. The low-pressure row is the exception: both columns read 25 mm Hg absolute, so the age of the recovery unit does not change the target.
Source: 40 CFR 82.156(a), Table 1
Why the other answers are wrong
- 25 inches of Hg vacuum, a looser level for older units — The current Table 1 lists 25 mm Hg absolute in both the pre- and post-November 15, 1993 columns for low-pressure appliances.
- 4 inches of Hg vacuum, the usual pre-1993 level — 4 inches of Hg vacuum is a pre-1993 level for some higher-pressure appliances, not for low-pressure ones.
- 0 psig, since older units cannot pull a vacuum — Table 1 does not relax the low-pressure level for older recovery equipment.
Practice more of this
More EPA 608 Type III practice questions, or see every EPA 608 practice test.
Unofficial, not affiliated with the EPA or any EPA-approved certifying organization. Questions are original practice written from public EPA material, not real exam questions.